So here's the listy list:
- Bathroom Mirrors - I'm not really sure if the builder is putting those in or not.
- Drapes and or blinds - there are a bazillion windows in the house so I'm thinking of doing the most used rooms first and then slowly getting the extra ones completed.
- King Sized Bed - I have to make sure it will fit but I'm fairly certain it will. The cost for this is about $2,000 to $3,000 so this will take some time but it's definitely something that is needed.
- Headboard for the bed - I think it just makes it look more grown up, and needs to match the rest of the bedroom furniture so I may have to have it stained or do a fabric headboard.
- Area Rugs - Living room, Master Bedroom, Playroom, Boy's Room, Downstairs Guest..adding more to vacant rooms as these areas are completed.
- Swap out the interior doors for Shaker Style doors with 5 panels.
- Swap out the trim for a Craftsman Style trim.
No comments:
Post a Comment